At 0905 the structure assignment was transmitted for the Reed Farm development for a reported structure fire. Chief 10 was on scene taking command confirming a mulch fire. Engine 11-1 arrived and went in service with some brush rakes and PW’s. Crews also helped remove some siding that was damaged. Also crew’s used a TIC to confirm there was no further extension. Chief 10 released the assignment at 0924 hours.
